Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the health-check domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u249530162/domains/blogpontodevista.com/public_html/old_blogpontodevista/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-analytify domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u249530162/domains/blogpontodevista.com/public_html/old_blogpontodevista/wp-includes/functions.php on line 6114
Paulista finaliza pavimentação de rua em Jardim Paulista Alto – Blog Ponto de Vista

Paulista finaliza pavimentação de rua em Jardim Paulista Alto

Mais detalhes no link

Foto: Divulgação

por Letícia Lima

A Prefeitura de Paulista, na Região Metropolitana do Recife, concluiu a pavimentação de mais uma via na cidade.

Desta vez, o serviço foi executado na Rua 156, no bairro de Jardim Paulista Alto. A pista, que tem 250 metros de extensão, recebeu paralelo e calçadas.

Responsável pelo trabalho, a Secretaria de Infraestrutura já havia realizado o recapeamento ao longo do corredor dos ônibus da localidade.

A conclusão do serviço foi divulgada pela prefeitura do município na última quarta-feira (4).

COMMENTS